Guy Muntwyler Studio di Architettura

In a first phase, a technical remediation intervention was carried out with the aim of eliminating water infiltration and rising damp. The measures affected the walls, the plinth area, and the roof covering. In a second phase, the conservative pictorial restoration was undertaken. All interventions were carried out in coordination with the heritage conservation authorities.